December 2004 Financial
and Tonnage Results
|
Port of Galveston and GPFC |
|
POG |
POG |
|
|
|
|
Combined Income Statement |
|
GPFC |
GPFC |
Over |
|
|
|
December 31, 2004 |
|
December |
December |
(Under) |
|
|
|
|
|
|
|
Combined |
Combined |
Budget for |
|
|
|
|
|
|
|
Actual |
Budget |
December |
|
|
|
Operating Revenue |
|
$1,300,234 |
$1,338,367 |
($38,133) |
|
|
|
Operating Expenses |
|
$1,056,292 |
$950,445 |
$105,847 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Net Income (Loss) from Operations |
|
$243,942 |
$387,922 |
($143,980) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Other Income |
|
|
$221,660 |
$112,529 |
$109,131 |
|
|
|
Other Expense |
|
|
$326,932 |
$336,746 |
($9,814) |
|
|
|
Net Income (Loss) After Other
Income and Expense |
|
$138,670 |
$163,705 |
($25,035) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Deduct Depreciation and
Amortization |
|
$241,514 |
$262,688 |
($21,174) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Net Income (Loss) for the Period |
|
($102,844) |
($98,983) |
($3,861) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues
are on Budget. Operating Expenses are
over Budget due to the high cost of
contract labor in the Cruise
operations, cost of contract security
at the former Todd Shipyard property,
recording Insurance Expense on the
shipyard property from October 25th to
the end of the year and Tools &
Vehicles, etc., cost of shuttle
service operating two parking lots.
Other expenses that were over budget
were Direct Sales due to December
employee-relations event and timing on
Advertising and Professional Services
due to the payment on agreements to
review dredging costs and inspect and
survey Port Property. |
|
Cargo Report |
November |
December |
Pct. + / - |
December |
Pct. + / - |
Y-T-D |
Y-T-D |
Pct. |
|
|
2004 |
2004 |
Last Mo. |
2003 |
Last Yr. |
2004 |
2003 |
YTD + / - |
|
|
|
|
|
|
|
|
|
|
|
Total Cargo |
265,383 |
227,874 |
-14.13% |
316,114 |
-27.91% |
3,384,776 |
3,429,084 |
-1.29% |
Cargo
Increases for December 2004
- The Port experienced a gain over
December 2003 in Other Bulk (Cement)
and Incidental Containerized Cargo handled
outside of the Pier 10 Container Terminal.
The
Port experienced a gain over
November 2004 in Bulk Grain Export
Cargo, Other Bulk (Cement), Refrigerated
Cargo – Bananas and Fruit, and
Incidental Containerized Cargo handled
outside of the Pier 10 Container Terminal.
Cargo
Decreases from December 2003
occurred in Bulk Grain Export Cargo (down
by 88,240 Short Tons), Miscellaneous Dry
Bulk Cargo (Fertilizer), Refrigerated
Cargo – Bananas and Fruit, General Cargo
and Ro-Ro Cargo.
Cruise
Passenger Activity:
Year-to-Date
Embarkations end-December 2004 vs. 2003: Up
16.48% (61,510
Passengers)
Year-to-Date
Disembarkations end-December 2004 vs. 2003: Up
16.10% (60,057
Passengers)
Year-to-Date
Port-of-Call Passengers end-December 2004
vs. 2003: Up 100% (2,076
Passengers)
Cruise
Passenger Vehicle Parking:
December
2004 vs. November 2004: Down 7.2% (-497
Vehicles) (6,405 vs. 6,902 vehicles)
December
2004 vs. December 2003: Up 54.23% (+2,252
Vehicles) (6,405 vs. 4,153 vehicles)
Year-to-Date
end-December 2004 vs. 2003: Up 13.88%
(+7,051
Vehicles)(57,853 vs. 50,802 vehicles)
Port
News
Port
Use Permit – Tariff Circular No. 6, Item
No. 111
The
Port User Permit Tariff Item, which was
approved by the Board of Trustees in
November 2003 and incorporated into the
Galveston Wharves Tariff Circular No. 6 is
currently being implemented.
Port staff conducted an in-depth survey
during April and May 2004 of commercial
entities accessing Galveston Wharves’
property, specifically the Texas Cruise Ship
Terminal on Galveston Island®. A total of
thirty-four (34) companies were identified
at that time. Hotel and Motel operators
sending shuttle buses to the Cruise Terminal
accounted for approximately 30% (10 out of
34) of the commercial entities picking up
and dropping off passengers at the Cruise
Terminal Complex. Four (4) bus lines and six
(6) taxi operators were also identified.
There were also a number of limousine
services, rental car companies and off-Port
parking lot operators with commercial
vehicles.
Port
staff is preparing to invoice for the Port
access in October-December 2004. Port
staff is also working to identify who the
“unknown” users are and to notify them
that they must obtain permits, and also to
invoice them if possible. The
outstanding issue remains regarding the
invoicing of the User Fees to the
Hotel/Motel shuttle vans that make pick-ups
and drop-offs at the Cruise Terminal.
Cruise
Terminal Security Condition, Area Maritime
Security Committee and Security Related
Issues
The
Port and Cruise Terminal are currently in
Maritime Security (MARSEC) Condition I. The
next meeting of the Area Maritime Security
Committee will be January 27 in Houston.
Port representatives will meet with the
Coast Guard on February 2 to discuss cruise
terminal and cruise ship security related
issues.
CY2004
End of Year Cruise Statistics and Revenues
The
CY2004 Projected Cruise Revenues for
Carnival cruises were based on 1,600
passengers and 250 vehicles per cruise
average for cruises of Celebration;
2,100 passengers and 300 vehicles per cruise
for Elation; and 2,500
passengers and 150 vehicles per cruise for Grand
Princess. Projected
revenues
for Royal Caribbean cruises were based on
2,000 passengers and 300 vehicles per cruise
average for Rhapsody of the Seas;
1,700 passengers and 120 vehicles for Splendour
of the Seas 11/12-day cruises and 200
vehicles for the 4/5-day cruises; and 1800
passengers and 120 vehicles for Celebrity’s
Galaxy. In 2004, average passenger
numbers for all cruises with the exception
of Galaxy (3% less) finished
ahead of projections. The total number of
embarking passengers for CY2004 was 434,289
or a 16% increase from CY2003.
Cruise
Terminal 2 Renovations
On
November 22, a fourth amendment to the
Design-Build Agreement relating to Terminal
No. 2 was entered into between the Galveston
Port Facilities Corporation and CH2M Hill
Constructors, Inc. for $4,261,898. This
amendment was for Phase 2C-2, which included
additional terminal renovation work not
included in Phase 2C-1 such as electrical
upgrades necessary to support the passenger
loading bridge, escalator and elevator;
installation of interior restrooms; Customs
and Border Protection inspection areas;
additional building finishes and mechanical
work. Wharf work continues. All concrete and
steel pipe piles have been driven and the
scour repair in the vicinity of the
underwater area affected by the cruise ship
bow thrusters has been completed. 90% of the
pier apron panels have been installed and
the pier expansion should be completed by
the first week of February. The water
station has been completed and is being used
by the cruise ships. The passenger bridge
was delivered November 27. Construction of
the concrete pedestals to support the
loading bridge and the footings of the
vertical core necessary to support the
bridge has been completed. Ceiling painting
has also been completed and the studs for
the insulated wall panels installed. Final
completion of all Terminal No.2 work is
scheduled for July 1, 2005.
Perimeter
Security Surveillance Camera Project
(Federal Grant Project)
The
bid opening for the surveillance camera
project funded by Round 2 of the Federal
security grants program was held on April
27, 2004. Johnson Control, Inc. was the low
bidder at $407,405. This includes the
procurement, installation and integration of
the cameras with the surveillance system
being designed by L-3 Communications for the
Port. 38 of the 40 cameras for the project
have been installed. An Interim Progress
Review for the project will be held on
January 20. A month long intrusion
vulnerability test is also scheduled to
begin on January 20 to test certain
detection aspects of the L-3 system. TSL
representatives will be in attendance to
observe the first phase of the test. The
installation of the electrical system
necessary to support the system is complete.
Relocation
of Police Headquarters and EOC Development
(Federal Security Grant)
The
Federally funded project to build a new Port
Police Headquarters and a secondary
Emergency Operations Center was advertised
for bid during the week of September 20. A
bid opening was held October 21. All bids
exceeded the grant amount provided for this
project. On November 3, Port staff and the
design engineer, CH2M Hill, met with the
three lowest bidders to determine which
elements of the bid specifications were
causing the costs of the project to exceed
the initial estimate. Based on the comments
of the bidders, the Police Headquarters was
redesigned in an attempt to get a bid within
budget. The project was re-advertised on
November 14 and the second bid opening held
December 2. Six bids were received with the
lowest bid submitted by Brazos Commercial
Constructors (BCC), Inc. for $588,000. This
bid was within budget and a Notice of
Acceptance was sent to BCC on December 28.
The pre-construction meeting is scheduled
for January 20 and work should begin by the
first week of February. Final completion of
the facility is estimated to be late summer
2005.
Demolition
of Plant No. 3 and Sections G and H at Piers
39 and 40
Demolition
of Section G at Plant No. 3 is required to
provide for a west end road capable of
handling trucks and cargo in this part of
the Port in conjunction with the opening of
the 40th
Street Gate as the only entrance into the
west end of the Port. Sections G and H at
Piers 39 and 40 are safety hazards and
should be demolished. Bids were opened on
May 25. JTB Services, Inc. submitted the low
bid of $404,873. A Notice to Proceed was
issued on August 19. The demolition of Plant
No. 3 is 95% complete. The warehouse has
been demolished and demolition on the floor
at the south end has begun. This area must
be cleared to accommodate the new roadway.
Sections G and H of Piers 39 and 40 have
been demolished and the site cleared. JTB
has 180 days to complete the project.
Fuel
Cell Commissioning (Federal Security Grant)
The
fuel cell became fully operational on
January 12. There is an additional
installation to the fuel cell that will
ensure it does not feed into the power grid.
This installation must be checked by
CenterPoint after it is completed. The
installation cost is $133,961 and is payable
through a Federal security grant.
Pier
39 and 40 Development
In
addition, to the demolition of Sections G
and H at Pier 39 and 40, a Request for
Proposals for the demolition of the
remainder of Pier 39 and 40 was issued and
bids opened on August 17. Five companies
submitted bids ranging from approximately
$817,000 to $343,000 with one bid at
$198,000 that did not include a price for
crushed concrete. At the August 20, 2004
Board meeting, the Board approved award of a
contract to the lowest bidder, demolition
only. However, since that Board meeting, the
scope of the project changed, with fewer
warehouses to be demolished and the
possibility of the Port obtaining additional
crushed material with GRLP paying for it. A
second Request for Proposals was issued and
bids received on December 7. Three bids were
received ranging from $209,266 to $219,200
to include demolition of Pier 39 Warehouse,
Sections E and F and Pier 40 Warehouse,
Sections A through F. Han-Padron Associates
also completed a Conceptual Planning Report
that included developing Pier 39 and 40 for
ro-ro cargo. Their Engineer’s Estimate of
Probable Construction Cost was $17.5 million
for development of this area. Of this cost
approximately $7 million was for a 120,000
square foot warehouse and $6 million for
bulkhead repairs, fendering and moorings.
Port engineering staff estimates that a
useable facility could be developed for this
area for approximately $1 million including
demolition costs. Costs would include repair
of the pier apron as the area below the
apron has washed out leaving it unsafe for
any traffic. These repairs will be done
in-house using some contract labor. Board of
Trustees approval on any funds expenditure
will be obtained.
Pier
34 Upland Development
Based
on Board direction, plans to improve Pier 34
and the uplands area have been initiated to
accommodate ro-ro cargo in this area.
Engineering design work at Pier 34 by
Goldston Engineering has resumed and a draft
plan for this facility is expected by the
first week of February. The Board has
directed that Wallenius Wilhelmsen be back
at this site by April 1, 2005. $600,000 has
been budgeted in the FY2005 Capital
Improvements Budget to pave the 6.4 acres
and install lighting.
Cruise
Terminal Security Perimeter Improvements
(Federal Security Grant)
An
Invitation to Bid Proposal was advertised on
November 7 and 14 and a pre-bid conference
held on November 16. The project is to
construct four crash proof gates at the
various vehicle entrances to the cruise
terminals at Pier 23, Pier 26, Pier 28 and
Pier 29. This project is funded by a Federal
grant. The bid opening was held December 2.
Two companies submitted bids and the low
bidder was Commercial Fence Co., Inc of
Pasadena. Their bid was $264,645. A
pre-construction meeting was held on January
5. Work should begin in mid-February and
final completion is expected by April 30,
2005.
|